Saturday Sep 04th, 2010, 04:52:28

Secured Network Solutions Past Performance

Joint Forces Command Center

  • Fiber to the Desktop-18K+ LC Keyed Connectors for 6 Fiber Networks
  • Classified and Unclassified-Physical Separation Requirements for Copper
  • PDS Pathways-Installation in occupied areas
  • Server Room Buildout -80 Floor Mounted Full Size Cabinets
  • Flexible Network Distribution Boxes-20’ whips allowing WAO to be Relocated as Needed
  • Flexible Building Layout-False Floor Access
  • Large Cable Infrastructure-500K of Cat6 Cable/450K of MM

17,000’ OSP Duct Bank Infrastructure

  • High Pair Count Cables-1800Pr Copper & 288-Strand SM Fiber
  • Copper Splicing in Every Manhole-Re-entrable Splice Cases for Future Growth
  • Building Surge Protection-Pairs Terminated on Gas Modules
  • Future Ready Pathways-3-Cell Maxcell Innerduct
  • Confined Space Entry-Tools & Certs-Tripods, Blowers, Sampler
  • Continuous Fiber (No Splices)-Limited Only by Reel Lengths
  • Service Loops-100’ Fiber Service Loops in Each Manhole
 
Home About Solutions & Services Past Performance Careers Contact
Copyright 2010, Secured Network Solutions
Designed, Developed and Hosted by VBWebSites.net
Sitemap